ZONE
MAINTENANCE
Physical Plant Zone Maintenance consists of a
team of professionals dedicated to maintaining and
improving campus-building conditions for the
students, faculty and staff. The primary goal of
zone maintenance is to provide dedicated response
for maintenance and repair with “ownership” of the
zone residing with the team. If the team confronts
an issue that is beyond their abilities, it will be
directed to the Director of Physical Plant for
further review and action.
The campus will be
divided into zones manned with maintenance personnel
from Physical Plant. Each zone group consists
of (there are four groups) five (5) trades made up
of electricians, carpenters, HVAC mechanics,
plumbers and painters. Two zones groups are
dedicated in maintaining the academic buildings, the
third zone group will support student housing and
the fourth group (Central Plant Support Team) will
support all three-zone groups in the event they
required additional support or replacing absent
personnel.
All members of the
team are responsible for the respective zone they
are assigned in and thus are expected to assist each
other in carrying out all the maintenance
requirements of the zone. Each zone will be assigned
a leader; the leader will identify work and create a
list on what is to be accomplished for each
building. Zone leaders also service as a liaison
between Physical Plant and the building
coordinator in getting the miscellaneous work
accomplished, and are responsible for resolving
roadblocks to success of the team.
This concept will
allow Physical Plant to service the buildings
twice a year.
Listed below are
maintenance tasks typically performed by the Zone
Maintenance groups.
-
Changing burned out
lights or ballast replacement
-
Replace switches or
receptacles
-
Replace damage or
missing light covers
-
Repair or replace
exit signs
-
Repair emergency
lights
-
Reset electric
circuits
-
Repair campus clocks
-
Repair bathroom
fixtures and sinks
-
Repair/Unstop
toilets urinals
-
Maintain water
coolers
-
Patch and paint
damage walls
-
Maintain all door
hardware
-
Maintain stairwell
railings and steps
-
Repair or replace
baseboard
-
Repair windows and
trim
-
Replace missing
floor tile(s)
-
Maintain HVAC units
( if applicable)
-
Perform all
preventive maintenance on mechanical equipment
for the building
-
Repair and replace
blinds and shades ( extra charge for
replacement)
Academic Building
Service Schedule and how it operates:
Building
Schedule:
|
|
|
|
Zone
1 |
|
|
|
|
2009-2010 Maintenance Schedule |
|
1. Dunn Center |
July 13 - July 24 |
Oct 12 - Oct 23 |
Jan 25 - Feb 5 |
|
2. Stadium |
July 27 - July 31 |
Oct 26 - Oct 30 |
Feb 8 - Feb 12 |
|
3.
Warehouse |
Aug 3 - Aug 7 |
Nov 2 - Nov 6 |
Feb 15 - Feb 19 |
|
4. Tennis Center |
Aug 10 - Aug 14 |
Nov 9 - Nov 13 |
Feb 22 - Feb 26 |
|
5. Shasteen |
Aug 17 - Aug 21 |
Nov. 16 - Nov 27 |
Mar 1 - Mar 5 |
|
6. Foy Center |
Aug 24 - Sept 4 |
Nov 30 - Dec 11 |
Mar 8 - Mar 26 |
|
7. Ft. Campbell |
Sept 7 - Sept 11 |
Dec 14 - Dec 18 |
Mac 29 - Apr 2 |
|
8. Pace Alumni |
Sept 14 - Sept 18 |
Dec 21 - Dec 23 |
Apr 5 - Apr 9 |
|
9. Bookstore |
Sept 21 - Sept 25 |
Jan 4 - Jan 8 |
Apr 12 - Apr 16 |
|
10. McReynolds/ White House |
Sept 28 - Oct 2 |
Jan 11 - Jan 15 |
Apr 19 - Apr 23 |
|
11. Memorial Health |
Oct 5 - Oct 9 |
Jan 18 - Jan 22 |
Apr 26 - Apr 30 |
|
|
|
|
|
|
|
|
|
Team Members |
|
|
|
|
|
|
Byron Doggett |
EL |
|
|
|
|
|
Michael Thomas |
HV |
|
|
|
|
|
David
McElroy |
PL |
|
|
|
|
|
Supervisor-
Damaso Vega |
CY |
|
|
|
|
For questions or
concerns regarding Zone 1 contact supervisor
Damaso Vega.
|
|
|
Zone
2 |
|
|
2009-2010 Maintenance Schedule |
|
1. Archwood |
July 13 - July 17 |
Oct 26 - Oct 30 |
|
Archwood |
Jan 25 - Jan 29 |
Apr 26 - Apr 30 |
|
2. Clement |
July 20 - July 31 |
Feb 1 - Feb 19 |
|
3. Claxton |
Aug
10 - Aug 28 |
Jan 4 - Jan 22 |
|
4. Browning |
Sept
7 - Sept 25 |
Mar 1 - Mar 19 |
|
5. Power Plant |
Sept 28 - Oct 2 |
Mar 29 - Apr 2 |
|
6. University Center |
Oct 5 - Oct 23 |
Apr 5 - Apr 23 |
|
7. Ellington |
Nov 2 - Nov 20 |
Jun 7 - Jun 25 |
|
|
8. McCord |
Nov 30 - Dec 18 |
Jun 7 - Jun 25 |
|
|
|
|
|
|
Team Members |
|
|
|
Vacant |
CY |
|
|
Dennis
Neblett |
|
HVAC |
|
|
Vacant |
PL |
|
|
Scott
Parker |
|
GUM |
|
|
Supervisor
-
Craig Sager |
|
EL |
|
For questions
or concerns regarding Zone 2 contact supervisor
Craig
Sager.
Housing Service
Schedule
|
|
|
|
Zone
3 |
|
|
|
|
2009-2010 Maintenance Schedule |
|
1. Blount |
|
|
22 Jan - 26 Jan |
27 Aug - 31 Aug |
|
2. Cross |
|
|
29 Jan - 2 Feb |
4 Sep - 7 Sep |
|
3. Emerald Hills |
|
|
5 Feb - 239 Feb |
10 Sep - 21 Sep |
|
4. Hand Village |
|
|
26 Feb -9 Mar |
24 Sep - 28 Sep |
|
5. Harvill Hall |
|
|
12 Mar - 16 Mar |
1 Oct - 5 Oct |
|
6. Killebrew |
|
|
19 Mar - 23 Mar |
8 Oct - 12 Oct |
|
7. Meacham Apts |
|
|
26 Mar - 30 Mar |
15 Oct - 19 Oct |
|
8. Miller |
|
|
|
2 Apr - 6 Apr |
22 Oct - 26 Oct |
|
9. Rawlins |
|
|
9 Apr - 13 Apr |
29 Oct - 2 Nov |
|
10. Sevier |
|
|
16 Apr - 20 Apr |
5 Nov - 9 Nov |
|
11. Two Rivers |
|
|
23 Apr - 27 Apr |
12 Nov - 16 Nov |
|
12. Marion St. Apts |
|
|
30 Apr - 4 May |
19 Nov - 27 Nov |
|
13. Auxiliary Areas |
|
7 May - 11 May |
28 Nov - 7 Dec |
|
|
|
|
|
|
|
|
|
|
Mid May to 27 Aug, and December Semester
Break Extensive PM's in all Residence Halls |
| |
|
|
|
|
|
|
|
Zone 3 Maintenance Schedule is subject to
change due to Housing Requirements |
| |
|
|
|
|
|
|
|
Team Members |
|
|
|
|
|
|
|
Bill King |
EL |
|
|
|
Ray Johnson |
|
CY |
|
|
|
|
|
|
Carl Sinkler |
HVAC |
|
|
|
Ray Rausch |
PL |
|
|
|
|
|
|
Supervisor-
Mikelle Ramsay |
|
GMS |
|
|
|
|
|
|
|
Tim Hardy |
|
GUM
|
|
|
|
|
|
|
All questions
and concerns regarding Zone 3 should be emailed
to Jan Ellis
or call the Zone 3 work order line at 221-7424.
|
|
|
|
Zone
4 |
|
|
|
|
2009-2010 Maintenance Schedule |
|
|
|
|
|
|
|
|
|
|
|
Team Members |
|
|
|
|
|
|
Dan Kirby |
EL |
|
|
|
|
|
David Larsson |
HVAC |
|
|
|
|
|
Chris Bateman |
GUM |
|
|
|
|
|
Supervisor-
Kenneth Butts |
CY |
|
|
|
|
For questions or
concerns regarding Zone 2 contact supervisor
Kenneth Butts.
How the schedule
Works:
Each building is
setup for one (1) week of non-stop maintenance. If
any work orders are generated during the time the
zone group is in the building, the zone leader will
complete all request if possible. The Central
Plant Support Team group four will address all other
work orders that are generated between schedule
maintenance. If miscellaneous materials are required
for any work that is requested during maintenance
periods or between scheduled dates, Physical Plant will purchase the item and reschedule to
completed work order.
|